{"id":3851,"date":"2018-12-11T05:44:34","date_gmt":"2018-12-11T05:44:34","guid":{"rendered":"http:\/\/www.wakilsahab.in\/news\/?p=3851"},"modified":"2018-12-11T05:44:34","modified_gmt":"2018-12-11T05:44:34","slug":"karnataka-nuclear-reactor-sets-global-record-major-feat-says-pm-modi","status":"publish","type":"post","link":"https:\/\/www.wakilsahab.in\/news\/karnataka-nuclear-reactor-sets-global-record-major-feat-says-pm-modi\/","title":{"rendered":"Karnataka Nuclear Reactor Sets Global Record, &#8220;Major Feat,&#8221; Says PM Modi"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-3852\" src=\"https:\/\/www.wakilsahab.in\/news\/wp-content\/uploads\/2018\/12\/Kaiga-nuclear-reactor.jpg\" alt=\"\" width=\"266\" height=\"189\" \/><\/p>\n<p>Source-\u00a0<a href=\"https:\/\/www.ndtv.com\/india-news\/karnataka-nuclear-reactor-sets-global-record-major-feat-says-pm-modi-1960672\" target=\"_blank\" rel=\"noopener\">ndtv.com<\/a><\/p>\n<p>In a major accomplishment for India&#8217;s Department of Atomic Energy, the 220 MW nuclear reactor at Kaiga in Karnataka has completed a continuous run of 941 days to become the world&#8217;s longest running reactor without a shutdown in this marathon run.<\/p>\n<p>The earlier record of 940 days of continuous operation was held by a British reactor called Heysham-2, Unit-8 reactor, which set the benchmark in 2016.<\/p>\n<p>Prime Minister Narendra Modi has called it a &#8216;major feat&#8217; saying it was another world record by Indian scientists and engineers.<\/p>\n<p>Applauding the efforts, PM Modi tweeted, &#8220;Congratulations to all those associated with India&#8217;s nuclear energy programme. Their untiring efforts have enhanced India&#8217;s progress. The nation is proud of them.&#8221;<\/p>\n<p>During the stint, the indigenously designed Kaiga-1 nuclear power unit has been under continuous operation from May 13, 2016, and has generated revenues of\u00a0<span class=\"rupee\">Rs.<\/span>\u00a01,500 crore.<\/p>\n<p>The twin Indian made units of Kaiga 1 and 2 were started in 2000 at a total cost of\u00a0<span class=\"rupee\">Rs.<\/span>\u00a02,800 crore.<\/p>\n<p>According to India&#8217;s Nuclear Power Corporation of India Limited (NPCIL), &#8220;this landmark demonstrates the excellence in design, construction, safety, quality and operation and maintenance practices of India.&#8221;<\/p>\n<div id=\"checked\">This achievement comes on the back of extended technology denial and sanctions that the Indian nuclear establishment lived under after testing atom bombs in 1974 and in 1998 at Pokharan.<\/div>\n<p>It was the culmination of the Indo-US Civilian Nuclear Deal that led to lifting of sanctions on India&#8217;s atomic establishment.<\/p>\n<p>The Kaiga nuclear complex is not bereft of controversies. When it was set up many environmentalists protested against locating the atomic complex amidst the verdant forests.<\/p>\n<p>In 2009 it faced its worst crisis when an &#8216;insider&#8217; poisoned the water cooler within the secure nuclear island by adding radioactive tritium to the drinking water.<\/p>\n<p>Several workers were exposed to this radioactivity and even after a lot of investigation, till last reports, the person responsible had not been nailed down.<\/p>\n<div class=\"fb-background-color\">\n\t\t\t  <div \n\t\t\t  \tclass = \"fb-comments\" \n\t\t\t  \tdata-href = \"https:\/\/www.wakilsahab.in\/news\/karnataka-nuclear-reactor-sets-global-record-major-feat-says-pm-modi\/\"\n\t\t\t  \tdata-numposts = \"5\"\n\t\t\t  \tdata-lazy = \"true\"\n\t\t\t\tdata-colorscheme = \"light\"\n\t\t\t\tdata-order-by = \"social\"\n\t\t\t\tdata-mobile=true>\n\t\t\t  <\/div><\/div>\n\t\t  <style>\n\t\t    .fb-background-color {\n\t\t\t\tbackground:  !important;\n\t\t\t}\n\t\t\t.fb_iframe_widget_fluid_desktop iframe {\n\t\t\t    width: 100% !important;\n\t\t\t}\n\t\t  <\/style>\n\t\t  ","protected":false},"excerpt":{"rendered":"<p>Source-\u00a0ndtv.com In a major accomplishment for India&#8217;s Department of Atomic Energy, the 220 MW nuclear reactor at Kaiga in Karnataka has completed a continuous run of 941 days to become the world&#8217;s longest running reactor without a shutdown in this marathon run. The earlier record of 940 days of continuous operation was held by a [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3852,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[128,2719,2720,2721,2214],"class_list":["post-3851","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-india","tag-kaiga-nuclear-reactor","tag-karnataka-nuclear-reactor","tag-nuclear-power-corporation-of-india-limited","tag-wakilsahab"],"_links":{"self":[{"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/posts\/3851","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/comments?post=3851"}],"version-history":[{"count":1,"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/posts\/3851\/revisions"}],"predecessor-version":[{"id":3853,"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/posts\/3851\/revisions\/3853"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/media\/3852"}],"wp:attachment":[{"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/media?parent=3851"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/categories?post=3851"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.wakilsahab.in\/news\/wp-json\/wp\/v2\/tags?post=3851"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}